TitleWater Resources Development by the U.S. Army Corps of Engineers in Oregon
Publication TypeReport
Year of Publication1977
AuthorsU.S. Army Corps of Engineers. North Pacific Division, U.S. Army Corps of Engineers. Portland District, and U.S. Army Corps of Engineers. Walla Walla District
Paginationp.59, 104-105, 108, 114, 116
InstitutionUnited States Army Corps of Engineers
CityPortland, Or.
Call NumberOSU Libraries: Valley TC424 O7 U5
KeywordsDays Creek Dam, flooding, harbor, jetties, navigation, physical modification, Reedsport, Smith River, Umpqua River
NotesNavigation: South Jetty extended 1938, North Jetty done 1940, south side training jetty 1940. South Jetty repaired 1963. Details 1957 project for navigation channel on the Smith River. Gives traffic in 1975, average traffic from 1966-75, rough estimates of commodities shipped. Surveys: Jetty extention study began in 1973. Preliminary report was approved Jan. 1976. Flood control: details 1951 project for Umpqua River and tributaries. Levees at Reedsport finished 1969. Days Creek Dam authorized in 1974, preconstruction planning begun.
Label7310