Title | Water resources development by the U.S. Army Corps of Engineers in Oregon |
Publication Type | Report |
Year of Publication | 1959 |
Authors | U.S. Army Corps of Engineers. North Pacific Division, U.S. Army Corps of Engineers. Portland District, and U.S. Army Corps of Engineers. Walla Walla District |
Pagination | p.9, 11, 21, 59, 65 |
Institution | United States Army Corps of Engineers |
City | Portland, OR |
Call Number | OSU Libraries: Valley TC424 O7 U5 |
Keywords | flooding, harbor, jetties, navigation, physical modification, Scholfield Creek, Smith River, Umpqua River, Winchester Bay |
Notes | Navigation: details jetty and channel project at entrance; river channel from entrance to Reedsport; turning basins and side channels; and channel in Scholfield Creek. "The overall project is 98 percent complete." Gives 1957 river traffic, average traffic from 1948-1957. Referebces 1956 project for navigation channel on the Smith River from the river mouth to Sulphur Springs Landing. Flood control: details 1951 project for Umpqua River and tributaries. Reports: details report on modification of small boat harbor at Winchester Bay, due in f.y. 1959. Outlines review report for flood control, irrigation, power development and navigation. Public hearing held in Roseburg on 29 Nov. 1956. |
Label | 7310 |