TitleWater resources development by the U.S. Army Corps of Engineers in Oregon
Publication TypeReport
Year of Publication1961
AuthorsU.S. Army Corps of Engineers. North Pacific Division, U.S. Army Corps of Engineers. Portland District, and U.S. Army Corps of Engineers. Walla Walla District
Paginationp.10, 12, 24, 64, 68
InstitutionUnited States Army Corps of Engineers
CityPortland, Or.
Call NumberOSU Libraries: Valley TC424 O7 U5
Keywordsflooding, harbor, jetties, navigation, physical modification, Scholfield Creek, Smith River, Umpqua River, Winchester Bay
NotesNavigation: details jetty and channel project at entrance; river channel from entrance to Reedsport; turning basins and side channels; and channel in Scholfield Creek. "The overall project is 98 percent complete." Details 1956 project for navigation channel on the Smith River from the river mouth Sulphur Springs Landing. Gives 1959 traffic, average traffic from 1950-1959. Flood control: details 1951 project for Umpqua River and tributaries. Reports: details proposed f.y. 1959 survey of Winchester Bay. Outlines proposed review report for flood control, irrigation, power development and navigation. Public hearing held in Roseburg on 29 Nov. 1956. Report not yet completed.
Label7310